After 12 years’ design and construction, Shanghai Sheshan Shimao Pit Hotel ________ at the end of November 2018.
A.is open | B.opened | C.is opened | D.is opening |
更新时间:2021-11-06 11:11:46
|
【知识点】 过去发生的动作/状态解读
相似题推荐
单项选择
|
适中
(0.65)
【推荐1】There _________ a big gym in my school two years ago.
A.is | B.was | C.are |
您最近一年使用:0次
单项选择
|
适中
(0.65)
【推荐2】—Alice, I you up at eight but you didn’t answer.
—Oh, I in the kitchen then.
—Oh, I in the kitchen then.
A.called; cooked | B.called; was cooking | C.was calling; cooked | D.was calling; was cooking |
您最近一年使用:0次