组卷网 > 高中英语综合库 > 主题 > 人与社会 > 交通 > 交通与运输
题型:语法填空-短文语填 难度:0.65 引用次数:52 题号:17013470
阅读下面材料,在空白处填入1个单词或括号内单词的正确形式。

In La Paz there are many roads     1     bad condition. One road in particular,     2     goes north from La Paz,     3     (consider) the most dangerous road in the world. On one side the mountains rise     4     (steep); on     5     other side there is a sheer drop. On average, one vehicle comes off the road every two weeks. The drop is so great     6    anyone inside the vehicle is lucky to survive.

Thanks to Timoteo Apaza, the death toll     7     (fall). Every morning he climbs up to the bend to direct the traffic, working as a volunteer. Before that, he     8     (have) lots of jobs. How much do you think Timoteo receives from doing it? Nearly nothing. Sometimes drivers give him a tip which is just enough for him     9     (live) on. But often they just pass by,     10     (take) the human traffic signal for granted. The reason why he does it is that he feels it is his mission in life to help others.

相似题推荐

语法填空-短文语填(约210词) | 适中 (0.65)
文章大意:这是一篇说明文。文章讲述了中国西南部重庆市的轨道交通4号线为当地农民提供了一个更广阔的渠道来销售他们的农产品。
【推荐1】阅读下面短文,在空白处填入1个适当的单词或括号内单词的正确形式。

Every early morning in Southwest China’s Chongqing, there is a common scene at the city’s Rail Transit Line 4: A group of farmers     1     (shoulder) vegetables for sale are busy riding on the subway to downtown.

Nicknamed “packbasket special line”, the second phase of the subway line, connecting Shichuan town to the city center, has     2     total length of 32.8 kilometers and 15 stations. It     3     (provide) local farmers near the town with a wider channel for selling their produce since its opening.

Every morning around 6 o’clock, the entrance and exit of the Shichuan Town station of the line are     4     (crowd) with these special commuters (上下班往返的人)     5     baskets are filled with fresh seasonal vegetables. It took them more than one hour     6     (reach) the city before the opening of the line as they had to take several buses. Now, by taking the subway, they can get there in less than 30 minutes     7     any difficulty. The opening of this subway line not only saves money for the farmers but also time, bringing great     8     (convenient) to them.

To facilitate the farmers, the station, which was supposed to open at 6:15, now opens five minutes earlier every day. The staff members     9     (arrange) at the station also assist as much as possible: guiding them to     10     (efficient) enter the station in order and to use the elevators, and helping them with the baskets.

2024-06-10更新 | 69次组卷
语法填空-短文语填(约200词) | 适中 (0.65)
名校
文章大意:这是一篇说明文。文章介绍了切萨皮克湾隧道桥的修建过程以及意义。
【推荐2】阅读下面短文,在空白处填入1个适当的单词或括号内单词的正确形式。

The Chesapeake Bay Bridge-Tunnel runs across a large water area with the Chesapeake Bay on one side and the Atlantic Ocean on     1     other.

Before the bridge     2     (build), ferries (渡船)carried 50 to 60 cars     3     a time across the almost 18 miles of water. It took 90 minutes, and bad weather or rough waters sometimes delayed the ferry. As time went by, more people wanted to get across the bay quickly and on a     4     (rely)schedule. So in 1960, thousands of people began work on the engineering wonder.

The bridge was completed in 1964. But you could say that it’s never really complete. Johnson, who       5     (work)on the bridge for 20 years, and his crew go out daily     6     (inspect) the bridge structure, making sure it’s safe and functioning. Between 1995 and 1999, more roadway was added, making the bridge two lanes (车道)in each     7     (direct). In the next few years, a new tunnel (隧道)will be added to one of the     8     (original).

To some, the bridge is beautiful, inspiring and a symbol of       9     people can do. But to people such as Johnson, the bridge is     10     (simple)something necessary. It’s for someone who might need to go to the doctor’s office, buy school supplies or visit a friend.

2022-05-23更新 | 49次组卷
语法填空-短文语填(约140词) | 适中 (0.65)
名校
文章大意:这是一篇说明文。文章介绍了新南龙铁路建造的过程和意义。
【推荐3】阅读下面材料,在空白处填入1个适当的单词或括号内单词的正确形式。

Chinese workers once demonstrated their great efficiency in 2018.     1     (incredible), around 1,500 workers spent just nine hours     2    (complete) the construction of a new train station in Fujian Province, southern China. Seven trains and 23 diggers were used     3    (assist) the massive project.

A video     4    (release) on the Internet showed how the construction workers connected three major railroads with the new Nanlong Railway. They also set up the traffic signals and     5     series of traffic monitoring equipment.

The construction took place at the Nanlong Railway Station in the city of Longyan. It began on January 19 and finished     6     the early morning of January 20. The project was completed so quickly because the workers had been arranged into seven units to undertake different     7    (task) at the same time.

Measuring 246 kilometres in     8    (long), the new Nanlong Railway is a main transport link between south-east China and     9    (center) China. It supports trains     10     operate at a maximum speed of 200kph.

2022-03-22更新 | 354次组卷
共计 平均难度:一般