组卷网 > 知识点选题 > 交通与运输
更多: | 只看新题 精选材料新、考法新、题型新的试题
解析
| 共计 1 道试题
语法填空-短文语填(约170词) | 适中(0.65) |
1 . 语法填空

The major construction work on the world’s longest cross-sea bridge     1     (complete) on Oct. 24th, 2018, which connects Zhuhai in Guangdong Province with Hong Kong and Macao. A ceremony     2     (hold) in Zhuhai to celebrate its completion soon.

More than 400,000 tonnes of steel     3     (use) for the 6.7 km undersea tunnel and 22.9 km bridge. Therefore, the bridge     4     (name) “one of its seven wonders of the modern world near completion” by a British newspaper.

The travel time from Hong Kong to both Zhuhai and Macao     5     (cut) greatly. History    6     (make) in many aspects by the project. For example, maritime protection was taken seriously as the construction region     7     (overlap) with the reserve of Chinese white dolphins.

It was the first time that an immersed tube tunnel    8     (build) in open waters in China. Besides, it    9     (predict) that the bridge     10     (operate) for 120 years. If it were not for the progress of “Made in China”, the construction couldn’t have been realized in such a short time.

The “China technology” and “China standard” set by the Hong Kong-Zhuhai-Macao Bridge will even influence the world market.

2021-04-20更新 | 21次组卷 | 1卷引用:外研版(2019)英语选择性必修第四册 Unit 2 Period Two Using language 课时作业
共计 平均难度:一般