组卷网 > 高中英语综合库 > 主题 > 人与社会 > 交通 > 交通与运输
题型:语法填空-短文语填 难度:0.65 引用次数:202 题号:14977397
阅读下列短文,根据短文内容填空。在未给提示词的空白处仅填写1个适当的单词,在给出提示词的空白处用括号内所给词的正确形式填空。

A warning system to prevent drivers from falling asleep was introduced at the 2020 China International Fair for Trade in Services,     1     was held from September 4 to 9 in Beijing. The system can judge whether the driver is sleepy by monitoring how long the driver's eyes close. If the driver is tired, the system will sound an alarm until the driver's eyes reopen. In the future, other     2     (danger) driving behaviors, such as not wearing a seat belt and making phone calls while     3     (drive), might also be added into this warning system.

相似题推荐

语法填空-短文语填(约150词) | 适中 (0.65)
名校
文章大意:本文是一篇新闻报道。主要报道的是中国国家铁路集团有限公司周六表示,周五售出2288万张火车票,创下单日售票新纪录,并分析了出现这一情况的原因。
【推荐1】阅读下面短文,在空白处填入1个适当的单词或括号内单词的正确形式。

China State Railway Group Co., Ltd. (China Railway) said on Saturday that     1     sold 22.88 million train tickets on Friday,     2     (set) a new record for single-day ticket sales. Of the total, 20.95 million train tickets     3     (sell) on China’s official railway ticket-booking website.

Friday marks the presale of train tickets for the first day of the Mid-Autumn Festival and National Day holidays,     4     extend from Sept 29 to Oct 6 this year.

Ticket sales volumes reflect the travel demands of the people and the trends in economic and social development, said     5     official of China Railway, adding that the record-breaking ticket sales     6     Sept 15 are indicative of the strong demand for travel during the upcoming Mid-Autumn Festival and National Day “golden week” holiday.

China     7     (expect) to see 190 million railway     8     (trip) during the upcoming 12-day travel rush, which will last from Sept 27 to Oct 8. The Mid-Autumn Festival, falling on Sept 29 this year, is a     9     (tradition) Chinese Festival usually     10     (mark) by family reunions, watching the full moon and eating mooncakes.

2023-10-29更新 | 32次组卷
语法填空-短文语填(约230词) | 适中 (0.65)
名校
【推荐2】阅读下面短文,在空白处填入1个适当的单词或括号内单词的正确形式。

China speed is amazing the world. While other countries are struggling to make high-speed railway a reality, the China Railway Corporation       1     (busy) itself in laying down over 25,000 km of high-speed tracks over the past ten years - accounting for roughly two       2     (three) of the world's total length of high-speed rail lines.

Up to now , China has built the largest high-speed rail network worldwide. The     3     (impact) go well beyond the railway sector. It also includes changed patterns of urban development, increases in tourism, and growth of regional economy.     4     (boost) regional integration and economic growth, plans for high-speed maglev (磁悬浮) lines with trains traveling       5    a speed of 600 kph or more are taking shape in more Chinese cities.

“China started operating its first maglev railway more than a decade ago. Nevertheless, for lack of critical technologies at that time, we only concentrated on conventional high-speed rail, said Sun Zhang,     6    is a leading railway specialist. But the research team       7     (lead) by him, tried their best to learn advanced technologies from foreign countries and eventually developed our own innovations, greatly       8     (transform) our way of life.

There is no denying that all of these achievements make our travel convenient and       9     (rely) , especially during “Chunyun”,     10    annual test on the China's transportation system. Thanks to “China speed", people can go back home for reunions with families and friends in time.

2021-03-17更新 | 407次组卷
语法填空-短文语填(约170词) | 适中 (0.65)
文章大意:本文是一篇新闻报道,介绍了云南省大瑞铁路杉阳隧道顺利开通,使得大理至保山段有望通车的新闻。
【推荐3】阅读下面材料,在空白处填入适当的内容(1个单词)或括号内单词的正确形式,并填在答题卡的相应位置。

The Shanyang tunnel (杉阳隧道) of the Darui Railway has been completed recently. This project is good for the opening and     1     (develop) of Dali and Ruili in Yunnan province. With the tunnel     2     (finish), the Dali-Baoshan section of the railway is expected to open within this year,     3     (put) an end to the Baoshan’s status as a place with no rail links.

So far, the Dali-Baoshan section of the Darui Railway     4     (complete) all the bridge works and 95% of the station building construction.     5     our surprise, there are 21 tunnels in the Dali-Baoshan section in all.

With     6     length of 330 kilometers, the Darui Railway is a major project in the nation’s network construction plan. The Shanyang tunnel is the last part of the Darui Railway,     7     is the toughest part too. The 330-kilometer rail line     8     (cut) travel time to about three hours and thirty minutes from the current seven hours in the future.

Thanks to the efforts of engineers and workers, the project has been completed     9     (successful). It is believed that this project is key to the boom of     10     (west) regions of China.

2023-10-13更新 | 46次组卷
共计 平均难度:一般