1 . 根据句子结构的语法性,在下面空格处填入一个适当的词或使用括号中词的适当形式填空。
The Baihetan hydropower plant, China's second largest hydropower facility on the upstream branch of the Yangtze river, was 1 (formal) completed on Tuesday after the last generating unit was connected.
The plant is estimated to generate 62.44 billion kilowatt-hours annually, 2 could save about 90 million tons of coal a year and cut annual carbon dioxide emissions (排放) by about 248 million tons.
Baihetan is one of six huge hydropower 3 (station) along the Yangtze river, China's longest. The Three Gorges Corporation, the project's developer, has described the 289-meter dam (大坝) and 4 (it) associated facilities as one of the country's biggest and 5 (challenging) engineering projects.
Construction began in 2017, with a total investment 6 (estimate) at 170 billion yuan. As 7 major project in China's west-east power transmission (输送) program, it will deliver electricity across the country 8 cities in the east.
China goes on 9 (construct) hydropower plants in the southwest, despite a long and severe drought in the summer of 2022 that saw generation volumes drop, forcing regions 10 (limit) power consumption.