1 . 阅读下面材料,在空白处填入适当的内容或括号内单词的正确形式,并将答案填写在答题卡的相应位置上。
On October 23, 2018, President Xi Jinping announced the opening of the Hong Kong-Zhuhai-Macao Bridge (HZMB) in Zhuhai, Guangdong province.
The HZMB, 1 (locate) at the waters of the Lingding Sea, is a huge sea-crossing project, linking Hong Kong, Macao and the Chinese mainland city of Zhuhai. As the world’s 2 (long) sea-based project, the 55-kilometre bridge is the result of five years of research and another nine years of building. It has been described as one of the seven 3 (wonder) of the modern world”.
The project 4 (make) up of several parts. It is designed with 5 service life of 120 years. It can withstand very strong winds. The bridge’s engineers had to consider many environmental factors 6 (protect) the 7 (surround) environment while building the bridge. Chinese white dolphins, an endangered species that lives in the area, 8 (be) a particular concern.
The HZMB will make 9 much more convenient to travel between the three areas it connects. It will bring people in Hong Kong, Macao and Guangdong within a “one-hour living circle”, 10 is expected to attract more visitors. It will be a transport link as well as a social; economic, cultural, and tourism connection among the three areas.