组卷网 > 知识点选题 > 旅游
更多: | 只看新题 精选材料新、考法新、题型新的试题
解析
| 共计 2 道试题
语法填空-短文语填 | 适中(0.65) |
名校
文章大意:本文是一篇说明文,主要讲的是中国建造了香港珠海澳门大桥以及其影响。
1 . 阅读下面材料,在空白处填入适当的内容或括号内单词的正确形式,并将答案填写在答题卡的相应位置上。

On October 23, 2018, President Xi Jinping announced the opening of the Hong Kong-Zhuhai-Macao Bridge (HZMB) in Zhuhai, Guangdong province.

The HZMB,     1     (locate) at the waters of the Lingding Sea, is a huge sea-crossing project, linking Hong Kong, Macao and the Chinese mainland city of Zhuhai. As the world’s     2     (long) sea-based project, the 55-kilometre bridge is the result of five years of research and another nine years of building. It has been described as one of the seven     3     (wonder) of the modern world”.

The project     4     (make) up of several parts. It is designed with     5     service life of 120 years. It can withstand very strong winds. The bridge’s engineers had to consider many environmental factors     6     (protect) the     7     (surround) environment while building the bridge. Chinese white dolphins, an endangered species that lives in the area,     8     (be) a particular concern.

The HZMB will make     9     much more convenient to travel between the three areas it connects. It will bring people in Hong Kong, Macao and Guangdong within a “one-hour living circle”,     10     is expected to attract more visitors. It will be a transport link as well as a social; economic, cultural, and tourism connection among the three areas.

语法填空-短文语填 | 适中(0.65) |
名校
2 . 阅读下面材料,在空白处填入适当的单词或括号内单词的正确形式。

    1     ( sit ) back in my seat, I can’t believe that I’m about to travel along the railway that many foreign experts claimed was “impossible”. The train has been racing along     2     ( steady ) since it left Xining.

I was one of the people     3     came from all parts of China to work on this railway. Taking years to complete the Qinghai - Tibet Railway is a record of all of our efforts to overcome     4     most difficult challenges. How     5     ( protect ) the ecosystem was among the top concerns . The first landmark     6     ( catch ) my eye is the Qingshuihe Bridge, the world’s longest bridge built over permafrost. To prevent damage to wetlands and grasslands, 675 bridges     7     ( build ) between Golmud and Lhasa.

Tanggula Station,     8     ( locate ) at over 5,000 metres above sea level, is the highest railway station in the world. To make sure we stayed healthy, several oxygen - making stations were constructed. Passing Cuona Lake, I feel a sense of pride and     9     ( achieve ). Along the lake we built a twenty - kilometre wall to protect the lake     10     construction waste.

I’m proud that we built our “impossible” railway. It truly is an extraordinary “Sky Railway”.

共计 平均难度:一般