【推荐2】阅读下面材料,在空白处填入1个适当单词或括号内单词的正确形式。
On October 23rd, 2018,President Xi Jinping announced the opening of the Hong Kong– Zhuhai-Macao Bridge (HZMB) at an opening ceremony in Zhuhai, Guangdong province.
The HZMB, 1 (locate) at the waters of the Lingdingyang of Pearl River Estuary, is a huge sea crossing, linking Hong Kong and Macao to the Chinese mainland city of Zhuhai. As the world’s 2 (long) sea-based project, the 55-kilometre bridge is the result of five years of research and another nine years of building. It has been described as one of the “seven 3 (wonder) of the modern world” by the Guardian.
The project 4 (make) up of a 22.9-kilometer-long main bridge, a 6.7-kilometer-long tunnel and an artificial island off the bridge. It is designed with 5 service life of 120 years. It can withstand a strong wind equal 6 a maximum Beaufort scale 16. The bridge’s engineers had to consider many environmental factors to protect the 7 (surround) environment while building the bridge. Chinese white dolphins, an endangered species that lives in the area, 8 (be) a particular concern.
The HZMB will make 9 much more convenient to travel between the three areas it connects. It will bring people in Hong Kong, Macao and Guangdong within a “one-hour living circle”, 10 is expected to attract more visitors to the Guangdong-Hong Kong-Macao Greater Bay Area. It will be a transport link as well as a social, economic, cultural, and tourism connection among the three areas.