1 . 阅读下面短文,在空白处填入1个适当的单词或括号内单词的正确形式。
The 2.4-km-long Peljesac Bridge (佩列沙茨大桥), connecting Croatia’s mainland with the Peljesac Peninsula on the country’s southern Adriatic coast, 1 (be) a Belt and Road Initiative project built by China Road and Bridge Corporation (CRBC) .
The bridge has 2 (significant) improved people’s lives, cut travel time to the Adriatic coast and increased 3 (economy) opportunities for the region. “This bridge is not a luxury; it is our 4 (necessary),” said Prime Minister Andrej Plenkovic when the bridge was opened.
The construction team attached great importance 5 environmental protection. While 6 (build) the bridge, they took different measures to create 7 environmentally friendly site. A bubble curtain, a measure to reduce noise caused by underwater construction, 8 (apply) to decrease the disturbance to the wildlife in the sea and neighboring residents. In addition, oil containment zones were set up at the site 9 (prevent) possible oil leaks.
“I have worked on some other big projects in Europe, but none compare with the Peljesac Bridge project,” Selma Knudsen said, 10 worked as a commercial coordinator on the Peljesac Bridge project.